18" Gas Pipe-Line from Mohr to Assaluyeh With 34 Kms length
Description: Construction of 18” pipe line for Parsian Refinery
Client/Owner: Khatam al-Anbiya Construction Headquarter
Starting Date: 2019
Duration: 12 months
Location: Fars Province & Bushehr Privince
Main Works: ROW(RIGHT OF WAY), Trenching, Excavation, transport, Unload, Stringing, Field Bending, Field Jointing, Coating, Welding Operation, NDT, Bedding, Lowering, Tie-inns, Padding, Backfilling, Hydro Test , Reinstatement Line Length: 34.5 Km